Thameslink: Bermondsey Dive Under

Thameslink: Bermondsey Dive Under

CEEQUAL Excellent (96.6%) – Whole Project Award Version 4, April 2017 | London, England Client: Network Rail Designer: Ramboll Contractor: Skanska Assessors: Conor McCone & Craig Hales (Skanska); Kirsten Velthuis (Schofield Lothian); Charlotte Tuffley & Gerardo Austria (Network Rail) Project summary The Bermondsey Dive Under project, delivered by Skanska as part of Network Rail’s Thameslink … Continue reading “Thameslink: Bermondsey Dive Under”

Crossrail Surface Works: Acton Dive Under

Crossrail Surface Works: Acton Dive-Under

CEEQUAL Excellent (80.8%) – Whole Project Award + Interim Version 4, June 2017 | London, England Client: Network Rail / Crossrail Ltd Designer: Atkins Ltd Contractor: BAM Nuttall Assessors: Niall Gibbons (Network Rail), Colin Cartwright (Atkins), Neil Goulding (BAM Nuttall) Project summary Acton Dive-Under is the first Network Rail Surface Works project on the Crossrail Programme to receive an Excellent CEEQUAL Whole Team … Continue reading “Crossrail Surface Works: Acton Dive-Under”

Crossrail Surface Works: South East Spur (Interim)

CEEQUAL Excellent (84.5%) – Interim Client & Outline Design Award Version 4, January 2016 | London, England Client: Network Rail / Crossrail Ltd Designers: Balfour Beatty / WSP | Parsons Brinckerhoff Assessor: Daniela Eigner (WSP | Parsons Brinckerhoff) Project description The Crossrail Kent project encompasses the design and build for works on the two-mile stretch from Plumstead … Continue reading “Crossrail Surface Works: South East Spur (Interim)”

Hitchin Grade Separation

CEEQUAL Excellent (82.9%) – Design & Construction Award Version 5, Nov 2015 | Hitchin, England Client: Network Rail Designer: Tony Gee & Partners Contractor: HOCHTIEF (UK) Construction Assessor: Derek Walter (HOCHTIEF), Julian Gregory (Ecovigour) Project summary This project was conceived by Network Rail over 15 years ago to improve timetables on the East Coast Main Line … Continue reading “Hitchin Grade Separation”

Huyton & Roby Capacity Scheme

CEEQUAL Excellent (82.1%) – Whole Team Award Version 5, Nov 2015 | Merseyside, England, UK Highly Commended – CEEQUAL Outstanding Achievement Awards 2016 – Land Use Client: Network Rail; Designer: Mott MacDonald; Constructor: Buckingham Group; Assessor: Fran Kilmurray (Mott MacDonald) Verifier: Perry Shard (Balfour Beatty) Summary The Huyton and Roby Capacity Scheme was the first … Continue reading “Huyton & Roby Capacity Scheme”

Thameslink: Borough Viaduct

CEEQUAL Excellent (88.9%) – Whole Project Award Version 4, Dec 2013 | London, England, UK Winner – CEEQUAL Outstanding Achievement Awards 2016 – Multiple Client: Network Rail Design: Atkins and Jestico + Whiles Construction: Skanska Assessors: Liz Wood-Griffiths (Network Rail) and Victoria Burnham (Skanska); Verifier: Catherine Arotsky (Rickaby Thompson Associates Ltd) Summary Background The Thameslink … Continue reading “Thameslink: Borough Viaduct”

Connecting Eastside

CEEQUAL Very Good – Whole Project Award Version 4, May 2012 | Nottingham, England Client: Nottingham City Council Designer: Patel Taylor & Nottingham City Council Contractor: Nottingham City Council Assessor: Peter Mann Project summary The purpose of this project was to deliver key elements of the recently produced Sneinton Market and Eastside Gateway Neighbourhood Development … Continue reading “Connecting Eastside”

Farringdon Station Redevelopment

Thameslink: Farringdon Station Redevelopment

CEEQUAL Excellent (90.3%) – Whole Project Award Version 4, Mar 2012 | London, England, UK Winner – CEEQUAL Outstanding Achievement Awards 2013 – Ecology & Biodiversity Highly Commended – CEEQUAL Outstanding Achievement Awards 2013 – Historic Environment Client: Network Rail Design: Atkins Construction: Costain / Laing O’Rourke (Joint Venture) Assessor: Hannah Rich, Emma Shirbon & Rachael Riley Project summary … Continue reading “Thameslink: Farringdon Station Redevelopment”