Frodsham Wind Farm

Frodsham Wind Farm

CEEQUAL Excellent (77.4%) – Whole Team Award Version 5, July 2016 | Cheshire, England Client: Frodsham Wind Farm Ltd (Peel Energy) Designer: Fairhurst Contractor: Cheetham Hill Construction Assessor: Gemma Fenn (Cheetham Hill Construction) Project summary Frodsham Wind Farm is one of England’s largest onshore generating stations, and the largest in the Cheshire region, with an installed … Continue reading “Frodsham Wind Farm”

Crossrail: Thames Tunnel - TBM “Mary” breaks through at Woolwich station

Crossrail: Thames Tunnel

CEEQUAL Excellent (89.1%) – Whole Project Award Version 4, Jul 2015 | London, England, UK Winner – CEEQUAL Outstanding Achievement Awards 2016 – Water Resources Client: Crossrail Ltd Designers: Arup / Capita Symonds Constructor: HOCHTIEF Solutions AG / J. Murphy & Sons Ltd JV (HMJV) Assessors: Stephen Marr and Mike de Silva Summary The £14.8bn Crossrail project has … Continue reading “Crossrail: Thames Tunnel”

Loughor Viaduct Replacement

CEEQUAL Excellent (87.2%) – Whole Project Award Version 4, Mar 2014 | Loughor, Wales, UK Shortlisted – CEEQUAL Outstanding Achievement Awards 2016 Client: Network Rail Designer: Tony Gee & Partners Ltd Contractor: Carillion Rail Assessor: Jo Wall (TACP) Verifier: Colin Cartwright (Atkins) Project summary The project involved replacement of Loughor Viaduct. This was required by Network … Continue reading “Loughor Viaduct Replacement”

Colwyn Bay: Phase 1 – Flood Defence

CEEQUAL Very Good – Whole Project Award Version 4, Aug 2014 | Colwyn Bay, Wales, UK Client: Conwy County Borough Council; Designer: Mott MacDonald; Contractor: VolkerStevin; Assessor: Hazel Weston (URS); Verifier: Perry Shard (Balfour Beatty); Project summary The coastal defences along the Colwyn Bay frontage had several key issues to address through developments and improvements. As … Continue reading “Colwyn Bay: Phase 1 – Flood Defence”

Spårväg City Line 7 Accessibility Upgrade – Part 1

CEEQUAL Excellent (86.4%) – Construction Only Award Version 5, Mar 2015 | Stockholm, Sweden Highly Commended – CEEQUAL Outstanding Achievement Awards 2016 – Project Management Client: Trafikförvaltningen (Transport Administration, Stockholm County Council); Contractor: Skanska; Assessor: Anna Malmlund (Stockholm City Council); Verifier: Catherine Arotsky (Rickaby Thompson Associates); Project Summary Tram Line 7 is currently in regular service between Kungsträdgården … Continue reading “Spårväg City Line 7 Accessibility Upgrade – Part 1”