
An amended drainage design allowed increase used of SUDs and prefabricated drainage units with recycled content.
An amended drainage design allowed increase used of SUDs and prefabricated drainage units with recycled content.
The Blue line to Barkarby Access tunnel Robothöjden-Landningsbanan project achieved an Excellent (81.4%) #CEEQUAL Whole Team Award, congratulations to all involved!
Read all about the project in our case study:
https://www.ceequal.com/case-studies/blue-line-to-barkarby-access-tunnel-robothojden-landningsbanan/
The Blue line to Barkarby Veddesta Access tunnel project achieved an Excellent (81.9%) #CEEQUAL Whole Team Award, congratulations to all involved! @nyatunnelbanan , @tyrens_ab @whitearkitekter @ramboll @NCC_AB.
Read all about the project in our case study:
https://www.ceequal.com/case-studies/blue-line-to-barkarby-4711-access-tunnel-veddesta/