Hitchin Grade Separation

CEEQUAL Excellent (82.9%) – Design & Construction Award Version 5, Nov 2015 | Hitchin, England Client: Network Rail Designer: Tony Gee & Partners Contractor: HOCHTIEF (UK) Construction Assessor: Derek Walter (HOCHTIEF), Julian Gregory (Ecovigour) Project summary This project was conceived by Network Rail over 15 years ago to improve timetables on the East Coast Main Line … Continue reading “Hitchin Grade Separation”

Flybe Training Academy

CEEQUAL Very Good – Design & Construction Award Version 4, Nov 2011 | Exeter, England Client: Flybe Design: Robinson Architects, Robinson Engineers and MKP Construction: Flybe Assessor: Joanna Goodwin Project Summary The Flybe Training Academy is located on a 12 hectare site close to the company’s existing headquarters at Exeter Airport. The Training Academy was … Continue reading “Flybe Training Academy”

Bridgwater MLR Phase 1

CEEQUAL Very Good – Design & Construction Award Version 4, Mar 2012 | Bridgwater, England Client: Hallam Land Management Ltd Design: Halcrow Group Ltd Construction: John Sisk & Son Ltd Assessor: Mairead Whitty Project Summary The project was undertaken as part of the plans to redevelop the area of North East Bridgwater to provide a … Continue reading “Bridgwater MLR Phase 1”

Bow Loop Dredging

London 2012: Bow Loop Dredging

CEEQUAL Excellent (92.1%) – Design & Construction Award Version 4, Nov 2012 | London, England Client: Canal & River Trust Designer: Canal & River Trust Construction: Land & Water Services Project Summary The Bow Back Rivers are a 5.5 km system of waterways in East London that feed into the River Lee Navigation and the … Continue reading “London 2012: Bow Loop Dredging”

M53 Bidston Moss Viaduct Strengthening

CEEQUAL Excellent (82.2%) – Design & Construction Award Version 4, Feb 2013 | Birkenhead, UK (England) Client: Highways Agency (lead)/ Wirral Borough Council and Mersey Passenger Transport Authority Design: Amey Construction: Costain Assessor: Ian Nixon (Costain) Verifier: Perry Shard (Balfour Beatty) Project Summary Bidston Moss Viaduct is a 730 metre long box girder bridge which … Continue reading “M53 Bidston Moss Viaduct Strengthening”

Loch Ryan Port Development

CEEQUAL Excellent (75.5%) – Design & Construction Award Version 4, Nov 2012 | Cairnryan, Scotland Client: Stena Line Design: RPS Construction: McLaughlin & Harvey Assessor: Gemma Fenn (Fenn Environmental) Verifier: Lucinda Farrington (VolkerStevin Ltd) Project Summary This project was carried out in Loch Ryan in close proximity to Port of Cairnryan, Scotland. McLaughlin & Harvey was the … Continue reading “Loch Ryan Port Development”

Brunswick

CEEQUAL Very Good – Design & Construction Award Version 4, Mar 2015 | Birmingham, UK Client: Birmingham City Council Designer: Stewart & Harris Contractor: Keepmoat Homes Assessor: Deborah Cairns Project Summary Location: The development site sits among established existing dwellings on Albert Road, Brunswick Road and Antrobus Road in Handsworth, Birmingham. General Description: The project … Continue reading “Brunswick”