Project Blue – Avonmouth

CEEQUAL Good – Construction Only Award Version 4, Nov 2011 | Avonmouth, England Client: Severnside Distribution Land Ltd Design: Upton McGougan plc Construction: Dyer & Butler Project Summary The works carried out at Project Blue involved the construction of a 1200m long access road and 35m diameter roundabout which will eventually service a new distribution … Continue reading “Project Blue – Avonmouth”

Trafikplats Jara Gard

Trafikplats Jära Gård

CEEQUAL Very Good – Construction Only Award Version 4, Jan 2012 | Jönköping, Sweden Client: Trafikverket Design: Norconsult AB Construction: Skanska Sverige AB, Väg och Anläggning Syd Assessor: Gary Rogerson Project Summary Project Jära Gård, close to Jönköping in Sweden, comprises of the construction of a new in-situ concrete bridge that will create a grade separated junction. … Continue reading “Trafikplats Jära Gård”

Kirkby Household Waste Recycling Centre

CEEQUAL Very Good – Construction Only Award Version 4, April 2012 | Kirkby, England Client: Merseyside Recycling and Waste Authority Constructor: Cheetham Hill Construction Ltd Assessor: Gemma Fenn (E4 Environment) Verifier: Perry Shard (Balfour Beatty) Project summary The project involved the design and construction of a new Household Waste Recycling Centre (HWRC) in Kirkby, Merseyside … Continue reading “Kirkby Household Waste Recycling Centre”

Basildon Enterprise Corridor

CEEQUAL Excellent (75.1%) – Construction Only Award Version 4, Jul 2012 | Basildon, England Client: Essex County Council Construction: Carillion Civil Engineering Assessor: Stuart Gibbs & Lucinda Farrington Project Summary The A127 Enterprise Corridor between Dunton and Burnt Mills is the largest employment area in Basildon and the Essex Thames Gateway Sub region. The project … Continue reading “Basildon Enterprise Corridor”

Trafikplats Jung

Trafikplats Jung

CEEQUAL Very Good – Construction Only Award Version 4, Jan 2013 | Kvänum, Sweden Client: Trafikverket Designer: Trafikverket Construction: Skanska Sverige AB Assessor: Gustav Larsson, John Nyberg, Anna Haradlsson (All Skanska) Verifier: Ailsa Collin (Halcrow) Project Summary Skanska was contracted by Trafikverket (the Swedish Transport Administration) to carry out the transformation of the existing crossroad highway … Continue reading “Trafikplats Jung”

Portadown and Lurgan Public Realm

CEEQUAL Very Good – Construction Only Award Version 4, Dec 2012 | Portadown, UK (Northern Ireland) Client: Craigavon Borough Council Design: RPS Group, WH Stephens and Caldwell Consulting Construction: SIAC (NI) Ltd Project Summary Within Craigavon Borough there are three town centres: Central Craigavon, Lurgan and Portadown. While Central Craigavon emerged from the ‘new towns’ movement … Continue reading “Portadown and Lurgan Public Realm”

TGOJ-porten

CEEQUAL Excellent (77.1%) – Construction Only Award Version 4, March 2013 | Grängesberg, Sweden Client: Trafikverket Design: Skanska Sverige AB Construction: Skanska Sverige AB Assessor: Gustav Larsson, John Nyberg and Hohanna Löfroth (Skanska Sverige AB) Verifier: Catherine Arotsky (Rickaby Thompson Associated Ltd) Project Summary Skanska was contracted by Trafikverket (the Swedish Transport Administration) to replace a … Continue reading “TGOJ-porten”

Poole Twin Sails Bridge

CEEQUAL Very Good – Construction Only Award Version 4, Sep 2013 | Poole, UK (England) Client: Poole Borough Council Contractor: Hochtief Construction Assessor: Derek Walter (Hochtief UK) and Julian Gregory (Ecovigour) Verifier: Karl Pitman (Pitman Associates) Project Summary The purpose of this project was to construct an iconic lifting bridge to supplement the existing bridge across … Continue reading “Poole Twin Sails Bridge”

Torry Quay Redevelopment

CEEQUAL Excellent (80.5%) – Construction Only Award Version 4, Dec 2013 | Aberdeen, Scotland Client: Aberdeen Harbour Board Designer: Arch Henderson Construction: McLaughlin & Harvey Assessor: Charlene Jones Gallery Challenges Water Environment and Marine Ecology Scottish Natural Heritage advised that the proposed development was located within the catchment of the River Dee, which is designated … Continue reading “Torry Quay Redevelopment”

Meadowhead & Stevenston UID Scheme – Work Package 6 - Twin wall Weholite pipes at North Lodge pumping station

Meadowhead & Stevenston UID Scheme – Work Package 6

CEEQUAL Excellent (76.6%) – Construction Only Award Version 4, Nov 2013 | Ayrshire, Scotland, UK Shortlisted – CEEQUAL Outstanding Achievement Awards 2016 Client: Scottish Water Designers: Halcrow / Black & Veatch Constructor: Morrison/Black & Veatch JV Assessor: Graham Wood (Scottish Water) Challenges and achievements Waste Management Part of the project involved 9 km of 900mm diameter rising main … Continue reading “Meadowhead & Stevenston UID Scheme – Work Package 6”