Sea defence upgrades Londonderry to Coleraine

Remedial works to NIR Sea Defences: Whitehead to Larne and Coleraine to Londonderry

CEEQUAL Good – Whole Project Award Version 4, Oct 2010 | Northern Ireland Client: Translink – Northern Ireland Railways Designer: URS / Scott Wilson Contractor: McLaughlin and Harvey Ltd Assessor: Sheila Mackenzie Project Summary The project comprised of essential repairs and upgrading to existing sea defences at various locations along the Derry to Coleraine railway … Continue reading “Remedial works to NIR Sea Defences: Whitehead to Larne and Coleraine to Londonderry”

Olympic Park: Greenway

CEEQUAL Excellent (97%) – Whole Project Award Version 4, Dec 2010 | London, England Client: Olympic Delivery Authority Design: Arup and Adams & Sutherland Construction: VolkerFitzpatrick Ltd Assessor: Chris Burgess and Leah Gilfrin Project Summary The Greenway is the name given to the embankment and footpath that runs along the top of Thames Water northern outfall … Continue reading “Olympic Park: Greenway”

A34 Wolvercote Viaduct Replacement Scheme

CEEQUAL Excellent – Construction Only Award Version 4, Dec 2010 | Oxford, England Client: Highways Agency Employers Agent: WSP Main Contractor: Costain Assessor: Amy Shuffleton Project Summary The aim of the Wolvercote Viaduct scheme was to replace the existing 45-year-old, 250-metre-long, 12-span structure that carries dual two lanes over the Birmingham mainline railway, the Oxford … Continue reading “A34 Wolvercote Viaduct Replacement Scheme”

Artist impression of Forth Replacement Crossing (Queensferry Bridge)

Forth Replacement Crossing: Queensferry Bridge (Interim)

CEEQUAL Excellent (92.7%) – Interim Client & Outline Design Award Version 4, Apr 2010 | Queensferry, Scotland Client: Transport Scotland Design & Construction: Jacobs / Arup (Joint venture) Project summary Despite significant investment and maintenance over its lifetime, the Forth Road Bridge is showing signs of deterioration and is not suitable as the long-term main crossing of the Firth … Continue reading “Forth Replacement Crossing: Queensferry Bridge (Interim)”

Blackfriars station

Thameslink: Blackfriars Bridge & Station Redevelopment (Interim)

CEEQUAL Excellent (89.1%) – Interim Client & Outline Design Award Version 4, Jul 2010 | London, England, UK Client: Network Rail Designer: Jacobs and Tony Gee & Partners LLP Construction: Balfour Beatty Assessor: Alan Cooke (Network Rail); Verifier: Catherine Arotsky (Rickaby Thompson); See Final Award Project Summary London is forecast to grow by nearly one million … Continue reading “Thameslink: Blackfriars Bridge & Station Redevelopment (Interim)”

Olympic Park Primary Foul Sewer

Olympic Park: Primary Foul Sewer and Pumping Station

CEEQUAL Excellent (93.8%) – Whole Project Award Version 4, Oct 2010 | London, England Winner – CEEQUAL Outstanding Achievement Awards 2011 – Landscape Client: Olympic Delivery Authority Designer: Arup and Barhale Construction / Donaldson Associates / John Lyall Architects Construction: Barhale Construction . Assessor: Richard Hunt & Arthur Gugan Project Summary The Primary Foul Sewer … Continue reading “Olympic Park: Primary Foul Sewer and Pumping Station”

Kiveton Retaining Wall (Cutting No. 8), Chesterfield Canal

CEEQUAL Excellent (89.2%) – Whole Team Award Version 3, May 2010 | Sheffield, England Client: British Waterways Designer: British Waterways Construction: Morrison Construction Assessor: Deanne Gow Project Summary The Kiveton Retaining Wall forms Cutting No.8 of the Chesterfield Canal, alongside Kiveton Park Railway Station. The lower part of the wall dates from the canal’s construction in … Continue reading “Kiveton Retaining Wall (Cutting No. 8), Chesterfield Canal”

Stratford High Street Public Realm Improvements (Interim)

CEEQUAL Excellent (95.1%) – Interim Client & Outline Design Award Version 3, Mar 2010 | London, England Client: London Borough of Newham Designer: AECOM & Buro Happold Assessor: Ron Henry Project Summary The Stratford High Street Public Realm Improvements project involves changes to the public realm along and in side streets off Stratford High Street extending … Continue reading “Stratford High Street Public Realm Improvements (Interim)”

A45/46 Tollbar End Improvement (Interim)

CEEQUAL Excellent (89.4%) –  Interim Client & Outline Design Award Version 3, May 2009 | Coventry, England Client: Highways Agency Client Supervisor: Arup Contractor: Morrison Construction Contractor’s Designer: Hyder Consulting Assessor: Sarah Hart Project Summary In June 2005 the Highways Agency as client appointed Morrison Construction, with Designer Hyder Consulting, on this Early Contractor Involvement … Continue reading “A45/46 Tollbar End Improvement (Interim)”