M40 Junction 15 (Longbridge) Bypass (Interim)

CEEQUAL Excellent (85.9%) – Interim Client & Design Award Version 3, Sep 2007 | Warwick, England Client: Highways Agency Contractor: Morrison Construction Designer: Hyder Consulting Assessor: Alison Morrisey Project Summary The team designed a dual carriageway bypass of the M40 Junction 15, allowing vehicles travelling on the A46 to avoid this busy junction. The bypass … Continue reading “M40 Junction 15 (Longbridge) Bypass (Interim)”

Victoria Footbridge Major Maintenance and Repair

CEEQUAL Excellent (75.8%) – Whole Team Award Version 3, Oct 2007 | Hereford, England Client: Herefordshire Council Designer: Owen Williams, Part of Amey plc Contractor: Interserve Project Services Ltd Assessor: Georgina Hammond Project Summary The Victoria Footbridge in Hereford is a Grade II Listed structure and was built in 1898 to commemorate the Diamond Jubilee … Continue reading “Victoria Footbridge Major Maintenance and Repair”

Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 6DCF New River Head to Stoke Newington (Interim)

CEEQUAL Excellent (87.2%) – Interim Client & Outline Design Award Version 3, Oct 2007 | London, England Client: Thames Water Utilities Ltd Designers: London Clean Water Network (LCWN) and Mott MacDonald Assessor: Casey Flemming Project Summary The Thames Water Ring Main (TWRM) northern extension from New River Head to Stoke Newington is one of the … Continue reading “Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 6DCF New River Head to Stoke Newington (Interim)”

London Overground East London Line Project (ELLP) (Interim)

CEEQUAL Excellent (85.9%) – Interim Client & Outline Design Award Version 3, May 2007 | London, England Client: Transport for London Designer: Mott McDonald Assessor: Huw Maggs & Jon Colclough Project Summary As part of the new London Overground, Phase One of the East London Line Extension will extend the existing East London Line north to … Continue reading “London Overground East London Line Project (ELLP) (Interim)”

N7 Naas Road Widening & Interchange Scheme

CEEQUAL Very Good – Whole Team Award Version 3, Jun 2007 | Naas, Northern Ireland Clients: Kildare County Council, South Dublin County Council and National Roads Authority Clients’ Engineer/Designer: Halcrow Barry Contractor’s Designers: Roughan & O’Donovan – Faber Maunsell (now AECOM): Alliance Contractors: Laing O’Rourke Infrastructure and Clonmel Enterprises Assessor: Rob McCathy Project Summary The N7 … Continue reading “N7 Naas Road Widening & Interchange Scheme”

Norton-Fitzwarren Dam

CEEQUAL Excellent (80.0%) – Design Only Award Version 3, May 2007 | Taunton, England Client: The Norton Fitzwarren Consortium (Barratt, Strongvox, Bellway) Designer: Hyder Consulting (UK) Ltd Assessor: Sarah Hart (Hyder) Project Summary The dam, designed by Hyder Consulting Ltd, is a flood attenuation structure designed to prevent flooding in the village of Norton Fitzwarren … Continue reading “Norton-Fitzwarren Dam”

M60 Junction 5–8 Widening

CEEQUAL Excellent (82.4%) – Whole Team Award Version 3, Jan 2007 | Manchester, England Client: Highways Agency Client Representative: Mouchel Parkman Designer: Halcrow Contractor: AMEC – Alfred McAlpine (acquired by Carillion) Joint Venture Assessor: Bruce Goldring Project Summary This complex £139.5m scheme provides additional capacity in the south west quadrant of Manchester’s orbital motorway, reducing delays, easing … Continue reading “M60 Junction 5–8 Widening”

Rushall Canal Embankment Works

CEEQUAL Excellent (82.4%) – Whole Team Award Version 3, Jan 2007 | Walsall, England Client: British Waterways (West Midlands Business Unit) Designer: British Waterways (Technical Services) Contractor: Morrison Construction Assessor: Tim Walker Project Summary Morrison Construction/British Waterways Omnibus Partnership is currently involved in a seven-year framework contract to undertake a backlog of mainly safety-related works … Continue reading “Rushall Canal Embankment Works”

Alkborough Tidal Defence Scheme

CEEQUAL Excellent (88.2%) – Whole Team Award Version 3, Jan 2007 | Alkborough, England Client: Environment Agency Design: Halcrow Project Management: Jacobs Construction: Volker Stevin Assessor: Phil Morgan Project Summary Alkborough Flats are on the south bank of the Humber Estuary, on the eastern side of the confluence between the River Trent and the River Humber. … Continue reading “Alkborough Tidal Defence Scheme”