Flens Framtida Vattenförsörjning

Flens Framtida Vattenförsörjning

August 3, 2017

CEEQUAL Excellent (75.5%) – Design Only Award Version 5, May 2017 | Flen, Sweden Design: WSP Assessor: Rebecca Johansson and Katarina Wärmark (WSP) Project summary The ‘Flens framtida vattenförsörjning’ project aims to secure the future water demand and quality in Flen, Sweden. WSP was contracted for the design of a new 20 kilometre pipeline to … Continue reading “Flens Framtida Vattenförsörjning”

Bristol Resilience Scheme (Interim)

March 8, 2016

CEEQUAL Excellent (92.8%) – Interim Client & Outline Design Award Version 4, Jan 2014 | Bristol, England Client: Bristol Water Designer: Black & Veatch Main Contractor: May Gurney Assessor: Vicky Lutyens Project Summary The Bristol Resilience Scheme comprises two pipelines and a pumping station. The scheme is needed to meet both supply needs due to … Continue reading “Bristol Resilience Scheme (Interim)”

Meadowhead & Stevenston UID Scheme – Work Package 6 - Twin wall Weholite pipes at North Lodge pumping station

Meadowhead & Stevenston UID Scheme – Work Package 6

March 3, 2016

CEEQUAL Excellent (76.6%) – Construction Only Award Version 4, Nov 2013 | Ayrshire, Scotland, UK Shortlisted – CEEQUAL Outstanding Achievement Awards 2016 Client: Scottish Water Designers: Halcrow / Black & Veatch Constructor: Morrison/Black & Veatch JV Assessor: Graham Wood (Scottish Water) Challenges and achievements Waste Management Part of the project involved 9 km of 900mm diameter rising main … Continue reading “Meadowhead & Stevenston UID Scheme – Work Package 6”

Cheddar Reservoir Two (Interim)

March 2, 2016

CEEQUAL Excellent (80.5%) – Interim Client & Design Award Version 5, Jul 2014 | Bristol, England Sustainability Strategy Rating: 90% Client: Bristol Water Designer: Arup Project summary In December 2013, Arup on behalf of Bristol Water Plc (Bristol Water), submitted a planning application to Sedgemoor District Council for permission to develop a 9,400 megalitre additional … Continue reading “Cheddar Reservoir Two (Interim)”

Barrow Gurney Reservoir

March 1, 2016

CEEQUAL Excellent (92.3%) – Whole Project Award Version 3, Oct 2008 | Bristol, England Client: Bristol Water Design: Black and Veatch Construction: Costain Assessor: Andy Smith Project Summary The objective of the project was to construct a 40mgl four-chamber partially buried and covered concrete reservoir with ancillary emergency pumping equipment. In addition, a controlling flow-brake … Continue reading “Barrow Gurney Reservoir”

Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 6DCF New River Head to Stoke Newington (Interim)

January 1, 2007

CEEQUAL Excellent (87.2%) – Interim Client & Outline Design Award Version 3, Oct 2007 | London, England Client: Thames Water Utilities Ltd Designers: London Clean Water Network (LCWN) and Mott MacDonald Assessor: Casey Flemming Project Summary The Thames Water Ring Main (TWRM) northern extension from New River Head to Stoke Newington is one of the … Continue reading “Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 6DCF New River Head to Stoke Newington (Interim)”

Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 4DCF Brixton To Honor Oak (Interim)

January 1, 2007

CEEQUAL Excellent (75.8%) – Interim Client & Outline Design Award Version 3, May 2011 | London, England Client: Thames Water Utilities Ltd Design: London Clean Water Network (LCWN) and Mott MacDonald Contractor: Morgan Sindal Assessor: Casey Flemming Project Summary The Thames Water Ring Main (TWRM) was completed in 1994 and comprises a complete tunnelled ring … Continue reading “Thames Water Ring Main Tunnel Extensions – AMP4 London Resilience Programme: 4DCF Brixton To Honor Oak (Interim)”