Widening of Tolo/Fanling Highway - Stage 2

Widening of Tolo/Fanling Highway – Stage 2

CEEQUAL Good – Design Only Award Version 5, May 2014| Tai Po, New Territories, Hong Kong Client: Highways Department, Government of the Hong Kong Special Administrative Region Designer: Hyder, Arup & Black & Veatch Joint Venture (HABVJV); Assessor: Francis Tang Project summary Tolo Highway and Fanling Highway form a major trunk road serving the north New Territories. In … Continue reading “Widening of Tolo/Fanling Highway – Stage 2”

A45/46 Tollbar End Improvement (Interim)

CEEQUAL Excellent (89.4%) –  Interim Client & Outline Design Award Version 3, May 2009 | Coventry, England Client: Highways Agency Client Supervisor: Arup Contractor: Morrison Construction Contractor’s Designer: Hyder Consulting Assessor: Sarah Hart Project Summary In June 2005 the Highways Agency as client appointed Morrison Construction, with Designer Hyder Consulting, on this Early Contractor Involvement … Continue reading “A45/46 Tollbar End Improvement (Interim)”

M25 DBFO (Interim)

M25 DBFO (Interim)

CEEQUAL multi-part – Interim Client & Outline Design Awards Version 4, July 2010 | Greater London, England Hatfield Tunnel: CEEQUAL Very Good Section 1x (J16-18): CEEQUAL Excellent (75.5%) Section 4a (J27-30): CEEQUAL Excellent (79.3%) Client: Connect Plus / Highways Agency Designers: Atkins, Gifford and WSP Contractor: Skanska and Balfour Beatty Joint Venture Assessor: Ghinwa Chammas M25 … Continue reading “M25 DBFO (Interim)”

M4 Widening Junction 29 (Castleton) to Junction 32 (Coryton)

CEEQUAL Excellent (82.6%) – Whole Project Award Version 3, May 2010 | Castleton, Wales Client: Welsh Assembly Government (Transport and Strategic Regeneration) Design: Jacobs Contractor: Carillion Civil Engineering Employer’s Agent: Parsons Brinckerhoff Environmental Advisors: RML Consult and TACP Assessor: Lucinda Farrington Project Summary The M4 Motorway is a strategically important trunk road providing an east-west link … Continue reading “M4 Widening Junction 29 (Castleton) to Junction 32 (Coryton)”

M40 Junction 15 (Longbridge) Bypass (Interim)

CEEQUAL Excellent (85.9%) – Interim Client & Design Award Version 3, Sep 2007 | Warwick, England Client: Highways Agency Contractor: Morrison Construction Designer: Hyder Consulting Assessor: Alison Morrisey Project Summary The team designed a dual carriageway bypass of the M40 Junction 15, allowing vehicles travelling on the A46 to avoid this busy junction. The bypass … Continue reading “M40 Junction 15 (Longbridge) Bypass (Interim)”

M60 Junction 5–8 Widening

CEEQUAL Excellent (82.4%) – Whole Team Award Version 3, Jan 2007 | Manchester, England Client: Highways Agency Client Representative: Mouchel Parkman Designer: Halcrow Contractor: AMEC – Alfred McAlpine (acquired by Carillion) Joint Venture Assessor: Bruce Goldring Project Summary This complex £139.5m scheme provides additional capacity in the south west quadrant of Manchester’s orbital motorway, reducing delays, easing … Continue reading “M60 Junction 5–8 Widening”