4th Generation Term Contract for the Management and Maintenance of the Scottish Trunk Road Network – North East Unit

4th Generation Term Contract for the Management and Maintenance of the Scottish Trunk Road Network – North East Unit

November 15, 2017

CEEQUAL Term Contract – Whole Team Award 2015/16: 73.6%  Version 5, October 2017 | Scotland, UK Client: Transport Scotland Contractor: BEAR Scotland Assessment Team: Craig Thom – BEAR Scotland Contract summary The trunk road network which connects Scotland’s cities, towns, airports and ports is overseen by Transport Scotland. BEAR Scotland have maintained the Trunk Road network … Continue reading “4th Generation Term Contract for the Management and Maintenance of the Scottish Trunk Road Network – North East Unit”

Kessock Bridge

4th Generation Term Contract for the Management and Maintenance of the Scottish Trunk Road Network – North West Unit

November 15, 2017

CEEQUAL Term Contract – Whole Team Award 2015/16: 75.3% Version 5, October 2017 | Scotland, UK Client: Transport Scotland Contractor: BEAR Scotland Assessment Team: Alan MacDonald – BEAR Scotland Contract summary The trunk road network connecting Scotland’s cities, towns, airports and ports is overseen by Transport Scotland. In 2013, BEAR Scotland was appointed as the Operating … Continue reading “4th Generation Term Contract for the Management and Maintenance of the Scottish Trunk Road Network – North West Unit”

Pont Briwet Bridge Replacement Scheme

September 26, 2016

CEEQUAL Very Good – Whole Team Award Version 5, April 2016 | Penrhyndeudraeth, Gwynedd, Wales Client: Cyngor Gwynedd; Designer: Hewson Consulting Engineers; Contractor: HOCHTIEF (UK); Assessors: Pat Jones (Cygnor Gwynedd) and Derek Walters (HOCHTIEF); Verifier: Gemma Fenn (Fenn Environmental); Project Summary In 2015, the redevelopment of Pont Briwet, a rail and road bridge across the Afon Dwyryd … Continue reading “Pont Briwet Bridge Replacement Scheme”

Bulford Road Improvement Scheme

September 23, 2016

CEEQUAL Excellent (82.0%) – Whole Team Award Version 5, May 2016 | Johnston, Haverfordwest, Wales Sustainability Strategy: Excellent (93.3%) Client: Pembrokeshire County Council; Designers: Atkins Ltd and Ramboll UK; Contractor: Alun Griffiths (Contractors) Ltd; Assessors: Colin Cartwright (Atkins), Julian Gregory (Ecovigour) Verifier: Gemma Fenn (Fenn Environmental) Summary Project background The Bulford Road Improvement project was conceived and designed to … Continue reading “Bulford Road Improvement Scheme”

Swindon Canal Walk & Regent Street Public Realm Enhancement

March 8, 2016

CEEQUAL Excellent (86.1%) – Whole Project Award + Interim Version 4, Apr 2011 | Swindon, England Client: Forward Swindon, South West Regional Development Agency, Swindon Borough Council (SBC) Designer: Arup (lead consultant & project engineer), Nicholas Pearson Associates (urban design & landscape architecture); Main contractor: Skanska Infrastructure Services Assessor: Richard Hunt Project Summary Swindon’s Public Realm Enhancement … Continue reading “Swindon Canal Walk & Regent Street Public Realm Enhancement”

Akvarteren, Lomma Hamn

Åkvarteren, Lomma Hamn

March 8, 2016

CEEQUAL Very Good – Whole Project Award Version 4, January 2012 | Lomma, Sweden Highly Commended – CEEQUAL Outstanding Achievement Awards 2013 – Land Use Client: Skanska Nya Hem Design: Tyréns, Sydväst, Sweco Construction: Skanska Sverige AB, Väg och Anläggning Syd Assessor: Gary Rogerson Project summary Åkvarteren is a 25,000 m2 regeneration project to create a … Continue reading “Åkvarteren, Lomma Hamn”

Bow Loop Dredging

London 2012: Bow Loop Dredging

March 8, 2016

CEEQUAL Excellent (92.1%) – Design & Construction Award Version 4, Nov 2012 | London, England Client: Canal & River Trust Designer: Canal & River Trust Construction: Land & Water Services Project Summary The Bow Back Rivers are a 5.5 km system of waterways in East London that feed into the River Lee Navigation and the … Continue reading “London 2012: Bow Loop Dredging”

M53 Bidston Moss Viaduct Strengthening

March 3, 2016

CEEQUAL Excellent (82.2%) – Design & Construction Award Version 4, Feb 2013 | Birkenhead, UK (England) Client: Highways Agency (lead)/ Wirral Borough Council and Mersey Passenger Transport Authority Design: Amey Construction: Costain Assessor: Ian Nixon (Costain) Verifier: Perry Shard (Balfour Beatty) Project Summary Bidston Moss Viaduct is a 730 metre long box girder bridge which … Continue reading “M53 Bidston Moss Viaduct Strengthening”