Meadow Lane Waterfront Regeneration

March 8, 2016

CEEQUAL Very Good – Whole Project Award Version 3, Mar 2012 | Nottingham, England Client: British Waterways Design: Atkins Construction: British Waterways and Morrison Construction Plc Assessor: James Tinnion Project Summary Over a five year period there has been quality improvements to the Nottingham Beeston Canal towpath where pedestrian counters and towpath surveys confirm increased levels of … Continue reading “Meadow Lane Waterfront Regeneration”

Bickershaw South

Bickershaw South

March 3, 2016

CEEQUAL Excellent (80.5%) – Whole Project Award Version 4, Sep 2012 | Leigh, UK (England) Client: Homes & Communities Agency Designer: URS & Amec Construction: Birse Civils Winner – CEEQUAL Outstanding Achievement Award 2013 – Flood Risk Assessor: Paul Arpino (Birse Civils/Balfour Beatty) Verifier: Gemma Fenn (E4 Environment) Project Summary Bickershaw South Infrastructure was a … Continue reading “Bickershaw South”

Kiveton Retaining Wall (Cutting No. 8), Chesterfield Canal

March 1, 2016

CEEQUAL Excellent (89.2%) – Whole Team Award Version 3, May 2010 | Sheffield, England Client: British Waterways Designer: British Waterways Construction: Morrison Construction Assessor: Deanne Gow Project Summary The Kiveton Retaining Wall forms Cutting No.8 of the Chesterfield Canal, alongside Kiveton Park Railway Station. The lower part of the wall dates from the canal’s construction in … Continue reading “Kiveton Retaining Wall (Cutting No. 8), Chesterfield Canal”

Meadow Lane Waterfront Regeneration (Interim)

March 1, 2016

CEEQUAL Very Good – Interim Client and Design Award Version 3, Jan 2009 | Nottingham, England Client: British Waterways Design: Atkins Contractor: British Waterways & Morrison Construction Omnibus Assessor: James Tinnion Project Summary The Nottingham Beeston Canal provides boaters with a route from Meadow Lane Nottingham to Beeston Lock, avoiding a non-navigable length of the River Trent. … Continue reading “Meadow Lane Waterfront Regeneration (Interim)”

Rushall Canal Embankment Works

January 1, 2006

CEEQUAL Excellent (82.4%) – Whole Team Award Version 3, Jan 2007 | Walsall, England Client: British Waterways (West Midlands Business Unit) Designer: British Waterways (Technical Services) Contractor: Morrison Construction Assessor: Tim Walker Project Summary Morrison Construction/British Waterways Omnibus Partnership is currently involved in a seven-year framework contract to undertake a backlog of mainly safety-related works … Continue reading “Rushall Canal Embankment Works”

Osberton Top Bridge Refurbishment, Chesterfield Canal

January 1, 2004

CEEQUAL Very Good – Design & Build Award Version 2, Jun 2003 | Osberton, England Client: British Waterways Designer: British Waterways Construction: GallifordTry Assessor: Mark Robinson Project Summary Osberton Top Turnover Bridge was a joint project between British Waterways and GallifordTry Construction through the BW North East Omnibus contract. The project involved the reconstruction of a red … Continue reading “Osberton Top Bridge Refurbishment, Chesterfield Canal”