Kirkby Household Waste Recycling Centre

Kirkby Household Waste Recycling Centre

CEEQUAL Very Good – Construction Only Award
Version 4, April 2012

Kirkby, England, UKCEEQUAL Very Good

Project team

Client: Merseyside Recycling and Waste Authority
Constructor: Cheetham Hill Construction Ltd

Assessor: Gemma Fenn (E4 Environment)
Verifier: Perry Shard (Balfour Beatty)

Project summary

The project involved the design and construction of a new Household Waste Recycling Centre (HWRC) in Kirkby, Merseyside for the client Merseyside Waste Disposal Authority. The £1.1million project commenced in September 2011 and was completed in Spring 2012.

The new HWRC has:

  • the capacity to receive up to 15,000 tonnes of householders’ waste and recyclable materials each year;
  • an increased number of containers – an opportunity to recycle more waste streams;
  • increased space on site for cars; and
  • the provision of an overhead weather-protection canopy.

This has made Kirkby HWRC a more convenient and agreeable facility for members of the public to use.

Gallery

This slideshow requires JavaScript.

Influence of CEEQUAL

CQA 326 Kirkby HWRC award presentationAlthough the project team undertook a CEEQUAL ‘Construction Only Award’, this didn’t prevent good relationships being formed with the client and neighbours. CEEQUAL was used as a checklist to identify opportunities to improve the sustainability credentials of the project at all phases.

This was the first time the company had utilised the CEEQUAL process on a project. Some of the lessons learnt included ensuring the requirements of CEEQUAL are discussed in project start-up meetings, not only with the project team but with any other subcontractors and ensuring data is collected throughout the project. The project team felt CEEQUAL was a useful tool that helped to capture best practice.

The score achieved on the Kirkby HWRC project will act as a benchmark for the company on future CEEQUAL projects.

Key work elements included:

  • approximately 3000m3 of cut and fill earthworks,
  • 5400m2 of concrete and tarmac hard standing areas,
  • 120m of reinforced concrete retaining walls,
  • rainwater harvesting facilities,
  • 1080m2 of structural steel canopy,
  • 420m2 structural steel recycling building,
  • construction of a welfare office and landscaping works.

Project Management

All topsoil was reused on-site at Kirkby HWRC

A detailed Construction Environmental Management Plan and Code of Construction Practice was developed, implemented and monitored throughout construction.

Materials

The cut-and-fill design optimised as much of the site-won material as possible. 97% of the materials present have been incorporated into the project. 100% of the topsoil was re-used on site and 70% of the material that was excavated has been re-used on the site.

Bird box at Kirkby HWRC

Bird box at Kirkby HWRCThe docking buffers used on the project are made of 100% natural SBR Rubber compound which in itself is 100% recyclable. 98% of the materials used on the project can be reused and recycled upon disassembly.

Ecology & Biodiversity

Trees were protected on site during construction and any trees that had to be removed were shredded, with the material being stored on site for use in the final landscaping.

Rainwater harvesting tank at Kirkby HWRC

Bird and bat boxes have been installed on the new structures, and these will be monitored by the client for at least the next five years.

Water Environment

There is a SUDs system in place, complete with newt crossing areas and a rainwater harvesting tank to collect water from the roof of the WEEE building, which will be used for the vehicle jet wash.

Connections were made to existing drainage, rather than constructing and connecting new drains to the network.