British Waterways and AWG Construction Services Ltd/BW Partnership (Midlands Omnibus):
Stabilisation of Polesworth Embankment


Embankment 4 on the Coventry Canal at Polesworth is 1210m long and up to 4m high and had been found to be unstable. The site is adjacent to, and subject to flooding from the River Anker. A thorough ground investigation was undertaken and a proposed solution to stabilise the embankment put forward. In addition to the slope stabilisation works canal wall and towing path improvements were carried out. Alternatives methods of stabilisation were considered. The cheapest option was rejected due to environmental considerations. The solution used was reinforced concrete bored piles were installed in the toe of the embankment to protect against a deep-seated failure of the slope. Additionally a toe berm was installed at the base of the embankment having the dual purpose of providing a level platform for the piling operations and providing resistance against shallow slips within the embankment.

 

The initial embankment stabilisation works were carried out in summer but the towpath was kept open for use by the public. This required careful management of pedestrian and construction traffic. To ensure smooth delivery of the works extensive community relations work was carried out including discussions with angling clubs that use the length.

The site is a very important wildlife corridor of reasonably high nature conservation value, otters are present on the River Anker, and Warwickshire County Council aspire to develop adjacent area as a nature reserve. Contractors used best practice to respect and protect the value of the site. The haul route passing through Mrs Hadley's orchard took the least destructive route avoiding the riverbank and the mature ash tree. Opportunities were taken to create new habitats during the works, these included scraping out shallow ponds, using wood chips from tree works to make grass snake breeding sites, as well as construction of an otter holt.

The scheme was assessed by Dr Mark Robinson, Waterway Conservation and Regeneration, British Waterways and verified by Dr Richard Hunt, Ove Arup and Partners.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment