Environment Agency and Babtie Brown & Root:
Littlestone Sea Defences


85.1%

The scheme was promoted by the Environment Agency with funding from DEFRA. Design and supervision of the works was carried out by Babtie Brown & Root, under their framework contract with the Agency. The outline and detail design works were fast tracked and completed in
only 14 months including planning consent and public consultation allowing construction started in June 2002. Due to the scale of the scheme the works were split in two phases, the first phase works consisting of the rock works and the delivery of 82,000m3 of shingle. Phase two was for the delivery of the remaining 158,000m3.

Construction was carried out by Westminster Dredging /Van Oord ACZ Joint Venture. The Phase 1 shingle delivery was carried out using the 'Volvox Scaldia' dredger which discharged onto the beach via a 450m floating pipeline. During the Phase 2 works the 'Volvox Scaldia' was joined by the 'Sospan Dau' dredger which delivered onto the beach via a method known as rainbowing, this is where a jet of shingle is pumped onto the beach and placed at low water by bulldozer.

A third Phase is planed for 2004 to raise the existing concrete sea defences to a consistent level.

The scheme has been constructed to time and below target cost.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment