Osberton Top Turnover Bridge was a joint project between British Waterways and GallifordTry Construction through the BW North East Omnibus contract. The project involved the reconstruction of a red brick arched accommodation bridge that was in a very poor condition. A number of bricks were missing from the arch and there was extensive damage to one of the abutments. It was not deemed viable to strengthen the bridge and therefore it was demolished and replaced with a similar structure that would complement the local character of the Chesterfield Canal.

The new structure was built using bricks, selected to match the existing bridges with a similar arch profile though incorporating additional air draft for user safety. Eminently hydraulic lime mortar was used to construct the arch to allow free drainage and thermal expansion / contraction of the arch and then saddled to provide the necessary strength. In addition, recycled stone steps and copings were obtained and original springing blocks that contained historically important wear marks, resulting from the ropes used by horse drawn boats, were reused within the new structure.

During construction of the bridge, which lies within a County Wildlife Site, disturbance to surrounding trees and hedgerow was minimised by having a compact site compound. The hedgerow adjacent to the site was enhanced with locally occurring species when the construction phase was complete. An advance survey had shown that the original structure was used by a protected species, the Daubenton's bat. Following consultation with English Nature and DEFRA, new roosting habitat was incorporated with the rebuilt structure (see Photo). Adjacent to the bridge eroded canal banks were reinstated and wildlife habitat created using a type of soft bank protection, coir roles, planted with locally sourced riparian plants (see photo).

The scheme was assessed by Dr Mark F Robinson, Waterway Conservation and Regeneration, British Waterways and verified by Dr Richard Hunt, Ove Arup and Partners.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment