CEEQUAL
Home Background How CEEQUAL works Awards Contact Us
CEEQUAL
Training Courses

Northern Ireland Roads Service, Scott Wilson & Ferguson McIlveen, and Whitemountain Quarries:
A5 Newtownstewart Bypass


Following the Good Friday Agreement the Chancellor announced a package of new road schemes for Northern Ireland. As part of the implementation of this package, the Department for Regional Development - Roads Service, appointed Scott Wilson (Scotland) Ltd. / Ferguson McIlveen LLP in Joint Venture as Consultants for the Newtownstewart Bypass at the end of 1998.

Working closely with Roads Service (Western Division), the team progressed the scheme through the statutory procedures in accordance with the primary legislation for Trunk Road schemes in Northern Ireland, The Roads (NI) Order. This has included the production and publication of an Environmental Statement, Direction Order and Vesting Order which were all subject to Statutory and Public consultation.

The bypass crosses the scenic and environmentally sensitive Strule River valley and significant measures were adopted to integrate the road into the landscape and to mitigate environmental impacts both during construction and when the road is in service. With a fish farm a short distance downstream and as an important fishing river in its own right, protection of water quality in the Strule was a major factor from the design viewpoint.

The Roads Service procured the works through a Design & Build Contract, awarded to Whitemountain Quarries and their designers, Parkman, in June 2001.

The £7 million project involved 2.6km of single carriageway trunk road bypass, some 900m of side roads, two composite bridges over the River Strule, construction of a reinforced concrete box culvert beneath the new bypass to to form a grade separated junction, and construction of 200m of retaining walls and a reinforced concrete pedestrian underpass. The scheme also incoporated the innovative use of a Sustainable Urban Drainage System (SUDS), which has no kerbs, an open stone filter with perforated pipe at its base being installed along both sides of the road. Surface water is led from these drains to five detention basins. These are planted with reeds which can neutralise contaminants in normal flows. Water from the basins is discharged to the river via penstocks which can be closed in the event of a serious spillage.

The Newtownstewart bypass not only features many civil engineering techniques, but was also the first contract in Northern Ireland to be carried out with an integrated management system for quality, environmental and safety standards.

The bypass opened in December 2003, two months ahead of schedule.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment