Northern Ireland Water Service and the Geda/EPS Consortium:
Greyabbey and Kircubbin Wastewater Treatment Works

91.9%

Greyabbey and Kircubbin are located towards the northern end of Strangford Lough, Northern Ireland. In 2001 Water Service Design Group undertook the task of designing 2 new Waste Water Treatment Works for the area: one on the existing site at Greyabbey and the other at
a new site at Monaghan Bank, Kircubbin. The design included the most up to date process technology - Membrane Biological Reactors. Construction started on the Kircubbin site in April 2002 and at Greyabbey in June 2002. The contract was awarded to Geda Construction Ltd and EPS (Ireland) Ltd in consortium. Both sites were commissioned in August 2003.

As Strangford Lough is an Area of Outstanding Natural Beauty, Area of Special Scientific Interest, and has a high environmental, cultural and heritage value with various bird and nature reserves, Water Service considered the potential effects of the construction on the appearance of the area as a whole, the effects on the ecologically sensitive surroundings and the effect on the local community. All of this had to be achieved within a tight budget.

With these in mind the project constructed two 'state of the art' Wastewater Treatment works, housed in buildings which reflect the surrounding area in the choice of material, finished in basalt style cladding and slate effect roof, landscaped with indigenous plants and shrubs where the land had been previously agricultural fields or concreted areas. The
local community was also considered with a high PR effort. Over the last 3-4 years Water Service representatives have given presentations and held discussions with council members, community representatives and members of numerous local nature and wildlife organisations. The project has taken on board feedback from these sessions and has tried to incorporate ideas, where possible, into the scheme. The contract used the NEC conditions of contract and was completed on time and to budget.

It was due to the high attention of detail to the environmental, cultural and heritage, community relations and land use issues that achieved the CEEQUAL award. To date it is the highest scoring project in the UK, obtaining a result of 91.9% - well into the Excellent Category.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment