Training Courses

M40 Junction 15 (Longbridge) Bypass

85.9%

Interim Client and Design Award

Project Team: Highways Agency (Client); Morrison Construction (Contractor); Hyder Consulting (Designer)

The Project

The team designed a dual carriageway bypass of the M40 Junction 15, allowing vehicles travelling on the A46 to avoid this busy junction. The bypass will be routed to the west of the junction and connected to the existing A46, north and south of the motorway. The existing M40 Junction 15 roundabout will be widened to four lanes, the approaches to the roundabout will be improved, and new traffic lights installed. The signing, road markings, road lighting and road pavement will be updated to improve safety and driver understanding. A new 4-span bridge will be built to take the new dual carriageway over the M40 motorway.

The southern connection between the new dual carriageway and the A46 Stratford road will be a roundabout, which will also provide access to the B4463 and M40 Junction 15. The roundabout will include underpasses to allow the safe movement of farm vehicles and pedestrians, cyclists and equestrians under the A46.

Ecology and Biodiversity

A large maternity bat roost was discovered in two ash trees adjacent to the M40 scheme footprint. The roost was one of only two large Noctule roosts known to English Nature (now Natural England), the other being near Cambridge. Due to the importance of the roost and the risk of disturbance from the scheme during both construction and operation, English Nature advised that they would formally object at Public Inquiry if the scheme were to go ahead unchanged. Following an extensive optioneering exercise, a revised scheme further east towards the village of Sherbourne was developed, which moved the proposed A46 bypass approximately 200m away from the roost.

In addition to the work on bats, ecological surveys were carried out in relation to flora, amphibians and other mammals. Advance works include plans for translocation of reptiles from existing highway verges to identified receptor sites nearby. The scheme design includes mammal mitigation to allow badgers and otters to cross the scheme via special underpasses and ledges within culverts.

Archaeology

The scheme is situated on terraces of the River Avon and these terraces have proved rich in archaeology in the past. A number of discoveries have been made in this general area, including various crop marks and henge sites (now Scheduled Ancient Monuments). In order to address concerns from Warwickshire County Council that further significant archaeological remains might be disturbed by the scheme, a comprehensive scheme of geophysical surveys and trial trenching was carried out, both on land required for the scheme itself and proposed borrow pits. To date, however, nothing significant has been found.

Sustainable design

Sustainable drainage principles were adopted in the drainage system designs. Whereas drainage current flows directly into watercourses within the scheme area, run-off from the proposed scheme will be fed through a system of five storm-water wetlands. This will not only provide attenuation and reduce peak flows, but will also help to treat run-off and remove contamination. Although not their primary purpose, the ponds will also provide improved habitat diversity and feeding opportunities for other species.

Borrow pits have been identified adjacent to the scheme to provide the significant volume of fill material needed (in the order of 700,000m3). Planning permission for the borrow pits was obtained via a separate planning application. By obtaining the material locally, thousand of lorry movements will be avoided, bringing substantial benefits to local residents by minimising impacts on local air quality, noise and disruption during construction.

Environmental and Community Liaison

The scheme has been developed in close co-operation with various statutory consultees including Natural England, the Environment Agency and the local authorities, Warwickshire County Council and Warwick District Council.

Summary

An 'Excellent' CEEQUAL Interim Award has been achieved by careful consideration of environmental issues from the outset, as described above. With input from the Morrison team, the scheme has been designed to minimise environmental impacts and ensure that design of the final scheme is sustainable. The development of a Construction Environment Management Plan shows a commitment to long-term environmental management during construction and operation.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment