Clark’s Bridge Refurbishment Project

Project Team: British Waterways – East Midlands (client & design), Galliford Try (construction)

The Clark’s Bridge refurbishment project was carried out to strengthen and repair a Grade II Listed structure on the Grantham Canal, a remainder canal in Nottinghamshire. It was a joint project between British Waterways East Midlands and Galliford Try Construction.

The structure is a masonry arch bridge, constructed of handmade bricks with lime mortar bedding circa 1797 for farm access. Prior to repair it had a reduced capacity, had been highlighted through British Waterways’ inspection programme as a structure in need of repair, and was on the local council’s buildings at risk register.

West Elevation – before

Saddling was the preferred strengthening option as the works were relatively straightforward on the lightly trafficked structure, and the saddle would be hidden once works were complete. This option also significantly prolonged life for a minimal additional present day cost. Additional work included the repair of damaged brickwork on the parapets and spandrel walls, replacement of the arch ring face with blue engineering bricks and the reintroduction of a continuous blue brick stringcourse at the base of the parapets. The parapets themselves were in such poor condition that they were taken down and rebuilt in their entirety, to the original bond pattern. The underside of the bridge was re-rendered with hydraulic lime mortar as repair of this brickwork would have been difficult to achieve.

Re-rendered underside of the bridge
(showing bat box entrance)

The correct choice of materials was an important aspect of the works. The aim was to maintain the heritage of the structure and to minimise the volume of material either taken off site or imported. Damaged bricks were carefully removed, cleaned, turned and re-used. Where this was not possible due to excessive damage, they were replaced with reclaimed bricks selected to closely match those in the existing structure. The damaged bricks were crushed and re-used in the fill material; the remaining fill was made of recycled material. FSC timber was used for both temporary and permanent works.

Representative samples of the existing lime mortar were sent for analysis to determine a matching mix. As part of the Listed Building consent, the lime mix and reclaimed brick type was agreed with the local planning authority. The lime mortar was protected with sheeting as the works were undertaken during the winter months. During the coldest period the structure was protected by tented scaffold and heating.

The props holding the intrados up during the works were drilled and fixed to the abutments in order to minimise disturbance to the waterway. Scaffold was close boarded and covered with plywood sheeting to retain debris. Debris netting was also installed to prevent materials from falling into the waterway.

The bridge was enclosed in a heated tent to protect the lime mortar during a cold spell. Maintaining a free waterway by keeping the propping out of the water minimised disruption to canal wildlife.

The site lies within a county wildlife site, and the adjacent (privately owned) farm is part of a countryside stewardship scheme. Disturbance of the surrounding landscape, including trees and hedges, was kept to a minimum. The top of the bridge was covered with Suretrac, an environmentally friendly material, and seeded with locally sourced grass and wildflower species. A survey determined bats were using the area, but not the bridge. A bat box has been cast into the concrete saddle and is accessed from the intrados via a small opening in the lime render. An interpretation panel was installed to assist understanding and appreciation of the structure.

West Elevation – after

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment