Alkborough Tidal Defence Scheme

88.2%

Project Team: Environment Agency (client), Jacobs (project management), Halcrow (design), Volker Stevin (construction)

Award presentation for the Alkborough Tidal Defence Scheme


Project background

Alkborough Flats are on the south bank of the Humber Estuary, on the eastern side of the confluence between the River Trent and the River Humber. The site is around 440 hectares of agricultural land, of which approximately 375 hectares are protected by a flood embankment constructed in the late 1950s.

The Alkborough tidal defence scheme cost £10.2 million and is a fundamental part of the Environment Agency’s long-term strategy for managing flood risk on the Humber Estuary.

More than 90,000 hectares of land and 300,000 properties around the Humber are below high tide levels and rely on the system of flood defences around the estuary.

Details of the scheme

The Alkborough tidal defence scheme increases the level of flood protection to an area stretching from the Humber Bridge to Goole up the tidal River Ouse and as far as Keadby Bridge on the tidal River Trent.

The scheme features include a 20-metre-wide breach of the existing flood bank, a 1,500-metre length of lowered embankment or spillway and a new section of floodbank to protect assets at the edge of the site.

The scheme has been designed to:

  • reduce the impact of sea level rise;
  • safeguard the internationally-important nature conservation interest of the Humber by creating new wetland habitat;
  • provide a focus for education and access opportunities for local communities.

The scheme was developed by a partnership of the Environment Agency, Natural England, Associated British Ports and North Lincolnshire Council.

For a flood event with a 0.5 per cent chance of happening in any year (1 in 200) the scheme at Alkborough will reduce extreme water levels by more than 150 mm.

Providing flood storage at Alkborough has made it possible to defer improvements to other flood defences in the tidal rivers upstream of the site that would otherwise be needed to counter the effects of sea level rise.

Habitat at Alkborough

Studies we carried out on the Humber Estuary show that valuable saltmarsh and wetland – known as inter-tidal habitat – will be lost over the next 100 years as a result of sea level rise.

The scheme at Alkborough assists in replacing these losses and recreates more than 150 hectares of wetland and increase the biodiversity of the area. Other smaller managed realignment projects are being developed in other parts of the estuary to help address this problem.

The new wetland habitats at Alkborough meets all national Biodiversity Action Plan targets for saltmarsh and mudflat habitat creation for 2006–2007. Part of the site has been developed as freshwater reedbeds to support a different range of species from the main inter-tidal area. As well as providing this new habitat the higher parts of the site will be used for grazing. This will add to the range of plants and animals that the site will support.

The total area of wildlife habitat created by the scheme is approximately 370 hectares, of which 170 hectares are inter-tidal areas. This contributes to habitat creation responsibilities under the EU Habitats and Wild Birds Directives set out in the Humber Estuary Coastal Habitat Management Plan.

Recreation and access at Alkborough

Alkborough tidal defence scheme is part of several larger projects being promoted along the South Humber bank. This includes a variety of access, education and interpretation projects funded by the Heritage Lottery Fund and a range of new visitor and tourism opportunities along the Humber from Barton to Alkborough, led by North Lincolnshire Council and funded by Yorkshire Forward.

Respect for the local community

The contractor, Volker Stevin, placed particular emphasis on maintaining a good relationship with the local community throughout the entire duration of the project.

The site manager kept neighbours informed, including the Parish Council and local farmers. A traffic plan was drafted to avoid overloading local roads with heavy vehicles. The contractor also sponsored a village show and several local building projects. The construction programme was adapted to suit farming cycles.

As a result of these particular efforts the project also won a Bronze Award through the Considerate Constructors Scheme in March 2007.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment