Cardiff County Council, Taylor Woodrow Construction:
Cardiff International Sports Village

91.9%


Taylor Woodrow Construction undertook the project with Cardiff County Council as the Client. The contract was an ICE Design & Construct.

Taylor Woodrow co-ordinated the detailed design for the remediation, which was undertaken by Churngold Remediation and Arup. Keller Ground Engineering designed the ground improvement works and the gas & leachate barrier and Tony Gee & Partners designed the revetment system.

The site is located on a man-made peninsular within the fresh-water lake formed by the construction of the Cardiff Bay Barrage. Construction of the barrage began in 1994 and freshwater impoundment commenced in 2001. Cardiff Bay represents an area of major regeneration in Cardiff, and is protected by the Cardiff Bay Barrage Act, which sets standards for water quality.

The site had a history of industrial and commercial land use including the presence of both licensed and unlicensed landfill tips. Coal discharging operations and large-scale storage of diesel fuels had resulted in contamination of the site by heavy metals and hydrocarbons.

The main works undertaken on the site included:

  • Exsitu bioremediation of 28,000m3 of hydrocarbon contaminated soil
  • Insitu bioremediation of 17,000m3 soil & groundwater
  • Removal of hydrocarbon free product from groundwater
  • Major earthworks to relocate 300,000m3 of treated soils in line with end uses
  • Treatment and validation of 14,000m3 of Japanese Knotweed infested soils
  • Installation of a bentonite cut off wall with gas membrane and leachate drainage system to the perimeter of the landfill tip
  • Dynamic & vibro-compaction of 95,000m2 of disused landfill tip
  • Installation of a passive gas venting system to the landfill tip
  • Installation of 1600m of sheet pile revetment including anchor system at the water’s edge
  • Improvement of soft alluvium by use of band drains and surcharging
  • Breaking out of hardstandings and the crushing, screening and reuse of arisings on site
  • Use of 50,000m3 of recycled aggregate

Works on site began in September 2003, and the project value was approximately £15 million.

The technologies used on site included cutting edge insitu bioremediation techniques utilizing electrolysis to treat ground water contamination. The project was one of the largest bioremediation operations undertaken in the UK and all hydrocarbon-contaminated soils were reused on site.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment