A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme

83.7%


Project Team: Transport Wales, Welsh Assembly Government; Halcrow Group Ltd; WynThomasGordonLewis Ltd; Laing O'Rourke Civil Engineering Ltd and Arup.



The project

The A470 Dolwyddelan to Pont-yr-Afanc Improvement of 7.2km (4.5miles) lies to the south of Betws-y-Coed. The project was an online widening of the existing single carriageway which is part of the main trunk road between Cardiff and Llandudno.

The critical parts of the A470 construction programme were the steep and wooded valley sides of the nationally designated Snowdonia National Park and mitigating the environmental impact. The successful completion of the improvement has therefore been a major achievement.

Crucial to this success has been the careful design and programming, innovation in construction, diligent application of the Environmental and Quality Management Systems, and the establishment of good relationships between the project partners, the local community and statutory bodies. It enabled the scheme to be substantially completed 5 months ahead of programme despite the environmental constraints, weather conditions and challenging terrain.

The A470 was scored by CEEQUAL for a 'Whole Project Award' which assesses the combined environmental performance of the Client, Designer and Contractor and achieved an 'Excellent' award. Some examples of the environmental issues covered during the assessment are given below.

Landscape Issues

Careful consideration was given to the effects of the scheme on the landscape of the area and its location within the Snowdonia National Park. Concrete walls were faced with local masonry stone and incorporated refuges for reptiles, bats and birds.

Agricultural and woodland soils stripped from the site area have been stockpiled separately and re-used in the areas of origin to retain the indigenous seed source. Similarly, new planting areas only use indigenous plant species from local provenance seed.

Archaeology

Archaeological surveys were undertaken prior to the works commencing on site. There are twenty archaeological sites throughout the scheme with the main areas of interest being the listed structures at Pont Gethin and Pont ar Lledr. The design and construction of the improved road in the vicinity of listed structures was undertaken in consultation with Cadw (the historic environment agency within the Welsh Assembly Government). During construction, watching briefs were carried out on site by Gwynedd Archaeological Trust.

Ecology and Biodiversity

The Lledr Valley is important for a large number of protected species and habitats including bats, otters and the Fairy Glen Site of Special Scientific Interest. The completed scheme incorporates features to ensure the favourable conservation status of these species. They include an artificial bat hibernacula for Lesser Horseshoe bats, refuges in the walls to provide opportunities for reptiles, birds and bats to nest/roost, and dry culverts and ledges to enable otters to pass safely beneath the road.

Waste Management

Reducing the production of waste throughout the construction phase was fundamental. 33,000 tonnes of recycled aggregate was utilised. Waste from adjacent quarries was processed and used throughout the works. Stone from existing walls was salvaged and reused. Other facing masonry was won from waste stone at local quarries in Blaenau Ffestiniog. Where it was necessary to remove existing pavement material this was removed and reused within the lower sub-base of the new road.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment