Target Alliance (Thames Water, Black & Veatch and Taylor Woodrow Construction):
Reading Sewage Treatment Plant

79.5%


Design and construction of the new Reading sewage treatment works is being undertaken by an Alliance consisting of the client Thames Water Utilities Limited, Taylor Woodrow and Black & Veatch. The main drivers for the £80m project are to meet new regulated standards for effluent discharge and sludge disposal in addition to eliminating odour nuisance.

The foundations for the project's CEEQUAL success lay in Thames Water's determination to set very high standards of environmental performance as one of the initial project objectives - a fact illustrated by the contractual emphasis on environmental management and the presence in the project team of a dedicated Environmental Manager. A thorough Environmental Impact Assessment, completed prior to commencement, contained extensive mitigation measures for the construction phase and enhancement proposals as part of the scheme design - important environmental aspects of civil engineering which are highlighted by the CEEQUAL process. Examples of the former are the air quality and landscape strategies agreed with Reading Borough Council whilst enhancements include creation of mounding as invertebrate sub-strate and the planting of over 20,000 native trees.

The Alliance made an early decision to operate an Environmental Management System (EMS) with the aim of gaining certification to ISO14001. Having achieved certification it is no surprise that the 'Project Environmental Management' section of CEEQUAL was one of the project's highest scoring elements.

Although a somewhat detailed design was required for Planning purposes, thus constraining total design freedom, the scheduling and tracking of decisions on all environmental design matters once on site ensured that nothing 'slipped through the net' in the course of making the many decisions that a project of this complexity requires. The 'Environmental Design Checklist' is reviewed every two months and all decisions and changes signed off once implications and agreements are reached. This process, and the results from it, is a further contributory factor to the high scoring in the CEEQUAL assessment.

From the early days of extensive site remediation, when an unexpected colony of water voles was successfully relocated under a licence from English Nature, to site controls as part of the EMS, the project to date has a very good environmental record.

Links to the other Projects:

Dartford Creek
Dartford Creek
St Germans Pumping Station Replacement
St Germans Pumping Station Replacement
Rugeley Bypass Phase 2
Rugeley Bypass Phase 2
M40 Junction 15 (Longbridge) Bypass
M40 Junction 15 (Longbridge) Bypass
A470 Blaenau Ffestiniog to Cancoed Improvement
A470 Blaenau Ffestiniog to Cancoed Improvement
Hademore Level Crossing
A30 Bodmin to Indian Queens Improvement
Hademore Level Crossing
Hademore Level Crossing
Victoria Footbridge
Victoria Footbridge
Parc Cybi
Parc Cybi
London Overground East London Line Project
Thames Water Ring Main Tunnel Extensions: AMP4 London Resilience
London Overground East London Line Project
London Overground East London Line Project
N7 Naas Road Widening & Interchange Scheme
N7 Naas Road Widening & Interchange Scheme
Norton-Fitzwarren Dam
Norton-Fitzwarren Dam
Thames Water Ring Main Tunnel Extensions
Thames Water Ring Main Tunnel Extensions
Clarks Bridge Refurbishment
Clark's Bridge Refurbishment
M60 Junction 5–8 Widening
M60 Junction 5–8 Widening
Alkborough Tidal Defence Scheme
Rushall Embankment Works
Alkborough Tidal Defence Scheme
Alkborough Tidal Defence Scheme
Carran Hill water treatment works
Carran Hill water treatment works
Snaresbrook Embankment Stabilisation Project
A689 Crook Bypass
Snaresbrook Embankment Stabilisation Project
Snaresbrook Embankment Stabilisation Project
Cardiff International Sports Village
Cardiff International Sports Village
Reading STW: Target Alliance
A470 Dolwyddelan to Pont-yr-Afanc Road Improvement scheme
Reading STW: Target Alliance
The Twin Rivers Diversion Scheme
Reading STW: Target Alliance
Reading STW
Taylor Woodrow: Newburn Riverside
Newburn Riverside
Northern Ireland Construction Service (Water Service): Greyabbey and Kircubbin Wastewater Treatment Works
Greyabbey and Kircubbin Wastewater Treatment Works
Northern Ireland Construction Service: A5 Newtownstewart Bypass
A5 Newtownstewart Bypass
Osberton Top Turnover Bridge
Osberton Top Turnover Bridge

Littlestone Sea Defences

Wakefield Flood Alleviation Scheme
Reading STW: Target Alliance
Stabilisation of Polesworth Embankment